Wednesday, March 11, 2009

Stopping Starvation In Africa

The end of the tunnel is perhaps not so far

Hello,

So? Where are the jobs? Ca advance or not? You're there in how long? What happens?? .... ??

So many questions, and we do not respond or very (perhaps too) soon ...

Eternity is a long time, especially towards the end ... And bin construction is like eternity ...

Enough nonsense, there advance and it always comes to attack the last chunks boring: the plasterboard ceiling.
So right now, a big thank you to Jerome for the loan (a totally indeterminate duration) of the lift plate (2nd best invention of man just after the shoehorn).
It's true that these small devices are not made for working at dizzying heights (no more than 3.5 m) but with a little trick ((playfulness, Sandrine eh!) Temporary flooring the empty room), a little luck (trestles made by Christian moult ago that exactly match the height of the temporary floor) and a good pair of Islands in c. .. c.., it's OK and here is the result of a weekend.

2 rows ...

... then 3 ... that's not bad!


But to achieve this result, it took:

- Move 3 times the temporary floor because we have only 3 beams and our boards are too short to cover the entire surface of the left right
- 3 times Move the planks on the beams because we do not have enough to cover the area from front to rear
- Move the lift plate, ladders, planks and the Trestle ...
- And finally, try not to break the g. ....

I let you admire the kings' castle bossottes "(according to Christian understanding of" scaffolding at the balance point of the most uncertain ")


beams placed on hold, put themselves on the ball stack ( we left a package, but "it can always serve"). Plates resting on beams. Re-boards laid on trestles this time themselves resting on pieces of pallets to achieve the desired height to the ridge.


Rise and plate scale placed on boards


plate on lift plate and Christian on scale


A little bit me anyway


A small cigarette break as long as time


And I would forget the great cuts in the plasterboard, because on the periphery of the ceiling as the walls are made of straw, otherwise it would be too easy, yeah, huh! Always made beautiful (well there's a personal taste, much like it's that Alex, the kids and me Na!)





Well, it's not just me and Christian work in this house (for now Alex is getting stronger because she knows that she will have to tape all seams with Patricia Ceiling: OUUAAIIIIIS!), but there is always Joel Unheard (or just whistling from time to time) and never complains (except when it falls on the "scrap crap" in the slab and he crushes the fingers because of the absence of release of the spike), which is still a valuable work! Judge for yourself:

Installation of power cable main coming from the basement
(we can see the blue and brown)


Here we see even better the cable, how are you "where?"!


Installation of the shower (on réagréage if you please to seal well!)


Installation exits from the sink faucet
(fixed steel plate that has just 'who knows where? Thanks Mic)


Laying the valve outlet shower front (in the rules of art) ...



... Back (always in the rules of art).


This is a small selection of creations by Joel (not to mention up to standard electrical panel at the bottom, install the water heater and all plumbing), a big thank you to my beautiful grandfather favorite!


Thanks and see you soon on this blog or site (coffee, tea, fag, give advice or take, print trace .......)