Monday, October 20, 2008

Motorcycle Thermal Riding Suits

Photos!

Hello, it's still us! Two posts on the same day is plenty! These are photos

promised and long awaited by the new unknown, which we hope will not remain too long ... unknown. (See comments Shilou and others completely unknown)

Alex to attack the last bit of wall!


the same in a more artistic


Christian at the top of the scaffolding, self-insured with harness, rope and brake on a ladder strapped to the scaffolding himself strapped to the pole the loft (it is a lot of straps, but at the same time it high!) It is a buyer for solutions for the installation of plates with a lift plate which does not amount to more than 3.5 m. ..


the same, and with a smile please!


And one from me anyway. I like a bar at the front ...

Yeduc Tijuana Mexico Pharmacy

finishes ... end

Ouch, ouch, ouch, October 20 we are, not an article from September 12 ... it is not very serious!
But suddenly, it was suggested (obviously in 5 weeks). I
as it finished the finishes, I still 50cm2, 50 cm2, but it was the last night too ... not have the courage.
So, yeah, the earth is over, well, not quite, we would refer to some walls that have already been made perfect story, but all the walls that had to be coated are.
hindsight, I feeling that it was pretty fast, was started in mid-July, and it's a very nice post, tiring, but really nice, probably because once the topcoat over, there are finishes that are emerging, suddenly, we know that it feels the end. A

not end immediately because the ceiling is a long time to implement, and Christian Sylvain find ways to climb a little shady high (we would have known we would have a maximum of 1.50m) and is our insulated house will be! It can then move up to Christmas in without straw hut.

Loading photos later ... it's worth a look!