Releasing
A week of skiing ... that! it feels good ...
But we must do it again. So, I keep the straw on the floor, a true artist's work, many cuts and tomorrow we're past the 7 floor boards! A new post over! Upcoming
work, electricity. Sylvain, Christian and dad attacked the next weekend, during which time I keep the straw with all the good will who want to join me. Ideally, when electricity is over, the straw is and also you get into the coatings ground.
Alexis gave us three truckloads of clay, so we'll start testing.
We hope to apply the coatings during the April holidays (from 12 to 27) so once again we appeal to artists, good will, the curious and the others to come and spin a little help. For those who have experienced the straw yards, you see, it will also be nice!
We will have time to talk, until I find my willy-boot.
Thursday, February 28, 2008
Sunday, February 10, 2008
Hemeroid Banding Not Reduced
The floor and ... post! Good resolutions
Some small news of the 4 little pigs!
Since January 29 what have we done? Well ... the floor of course! Ah yes! Alex promised photos here is one that summarizes our work quite
We thought we had ended the floor last weekend but did not count on the little surprises inherent in construction. Indeed reached the end of the first two thirds of the surface, that is to say early in the loft, we were confronted with a problem of level due to subsidence of the failure of the small farm. So we were forced to order an emergency post in our village carpenter-cabinetmaker neighbor who has kindly prepared us for this weekend. We find So with an additional pillar, which is far from unpleasant.
The second snag was around the fireplace (see photo album "floor") which forced us to make a header (to the delight of Christian who had always wanted to make one. See album photo).
Finally, we failed to complete seven boards for the floor, but it is virtually finished.
Meanwhile, Alex has largely continued the straw on the second floor, aided by the Djoulse.
One last thing: we have finally done a major cleanup of "Spring", all the straw hut Christmas was mounted on the floor and moved the loose straw in the garden shed to be used for subsequent coatings.
Well, why not go see the yard and drink a coffee, one never tires of visitors Sunday.
Some small news of the 4 little pigs!
Since January 29 what have we done? Well ... the floor of course! Ah yes! Alex promised photos here is one that summarizes our work quite
We thought we had ended the floor last weekend but did not count on the little surprises inherent in construction. Indeed reached the end of the first two thirds of the surface, that is to say early in the loft, we were confronted with a problem of level due to subsidence of the failure of the small farm. So we were forced to order an emergency post in our village carpenter-cabinetmaker neighbor who has kindly prepared us for this weekend. We find So with an additional pillar, which is far from unpleasant.
The second snag was around the fireplace (see photo album "floor") which forced us to make a header (to the delight of Christian who had always wanted to make one. See album photo).
Finally, we failed to complete seven boards for the floor, but it is virtually finished.
Meanwhile, Alex has largely continued the straw on the second floor, aided by the Djoulse.
One last thing: we have finally done a major cleanup of "Spring", all the straw hut Christmas was mounted on the floor and moved the loose straw in the garden shed to be used for subsequent coatings.
Well, why not go see the yard and drink a coffee, one never tires of visitors Sunday.